Search results

  1. Drakecula

    CBR summer get-together at 1730 on 24 November 2021

    Gah, I only saw this now and unfortunately I have other plans. I've been so busy lately I haven't been lurking as often in here. Hi to all, sad to miss it, but for sure I'll catch the next one! Life might slow down soon... Ah who am I kidding, new job next year maybe I'll breathe easier in 2023! Ha.
  2. Drakecula

    2022 travel plans

    No plans for 2022 except for small domestic trips. Will have to let our savings recover after building the house. But I'm hopeful we can do a Broome to Darwin tour in 2023, I've never been to that part of Australia before.
  3. Drakecula

    Housewatch: Drake Edition

    So we've been in just over two weeks - there's still a lot of stuff to sort out and put away, but we're getting there. I've got an afternoon tea booked with friends for Halloween, as by then I can have 10 visitors. So that's my deadline to really make sure the place is looking good :D Today...
  4. Drakecula

    CBR spring get together at 1800 on 20 October at The Kingo to celebrate CBR opening up and our high vacc rates

    I'd love to, but I'm going to be a bit tentative about the opening up, and wait a bit longer before emerging into the great outdoors. Next time for sure.
  5. Drakecula

    Housewatch: Drake Edition

    I'm so tired! But we're in! We spent our first night in the new place last night. Everything hurts. So much cleaning, lifting, moving, packing, unpacking... And of course it had to rain! A few minor casualties with some book boxes getting wet, but hopefully they'll be okay. Still some more...
  6. Drakecula

    Housewatch: Drake Edition

    Flooring is done, skirting boards are painted. Tomorrow is vacuum, sweep, dust and mop day to clean up. 4 sleeps until the moving truck comes!
  7. Drakecula

    Housewatch: Drake Edition

    Flooring is looking good! They actually were able to start a day earlier which was great for us.
  8. Drakecula

    Housewatch: Drake Edition

    Not much more to report since the last update. More things moved, and we went through and made a list of things that need follow up fixing, as well as things we'll have to do ourselves post flooring. Which is happening on Wednesday (touch wood). Once the flooring does go in, we'll have to go...
  9. Drakecula

    Housewatch: Drake Edition

    We have the keys! We got them yesterday actually, but I missed most of what was discussed with our site supervisor as I had a call I had to take. We had packed the car with stuff to take so it wasn't a wasted trip, heh. We set up the modem to get internet which now means MrD can work from there...
  10. Drakecula

    Housewatch: Drake Edition

    The pause button has been lifted! https://www.canberratimes.com.au/story/7421630/residential-construction-to-resume-on-friday-with-strict-requirements/?cs=24204 We have got everything re-booked in, should be getting keys early next week ahead of flooring later next week. Moving in by the end of...
  11. Drakecula

    Discussion on Cats, Moggies and Felines in general [with Pictures]

    I will Google what Catbib is, but at first glance my thought immediately goes to the words catalogue and bibliographic. It's something that wouldn't be so out of place in the library world... Afterall, there is a thing called WorldCat. Oh that's neat. Clever idea.
  12. Drakecula

    Housewatch: Drake Edition

    Well yes, it did get extended, and so our flooring will be postponed until it's allowed. Which pushes everything else back. We still haven't heard about getting keys despite the final payment going through last week. I know it may be tricky in this current situation, so I guess we will have to...
  13. Drakecula

    AFF Gathering #15 in NTL 2021 **Rescheduled** to 21-23 October 2022

    Hopefully next year it'll be able to go ahead. Thanks to those who have done the groundwork, I'm sure it'll make it that much easier to put together next year.
  14. Drakecula

    Housewatch: Drake Edition

    Ooh, thanks for that, that's a good break down. Those things like flooring and stuff won't be able to be done under current rules, so I will have to wait and see if the lockdown is extended. I'll definitely keep an eye on this page!
  15. Drakecula

    Housewatch: Drake Edition

    In preparation for getting keys at some point soon, we've begun booking in things. Moving is still an essential activity, but I'm unsure about flooring installation or any of those other things. So we will wait and see. In any case, flooring isn't booked until over a week away so perhaps it will...
  16. Drakecula

    Housewatch: Drake Edition

    I will keep that in mind, though we should be right. Dad's hoping to come up (from a non-red zone) and help as well.
  17. Drakecula

    Housewatch: Drake Edition

    Again another month goes by with not much happening until it's happening! Looks like the benchtop fixes will have to happen after we move in, but the other things have been patched up. Were told yesterday that once the final payment comes in from the bank (they have the paperwork as of last...
  18. Drakecula

    Housewatch: Drake Edition

    Practical completion inspection done. It's looking good! Only minor cosmetic things that need fixing, some dings/scratches and that kind of thing. We went around putting blue and yellow painters tape on walls and doors and other things to highlight the imperfections that will need touching up...
  19. Drakecula

    CBR winter get together at 1800 on 08 June at the Kingo to celebrate us still being here, not there

    I love poutine so I don't mind switching it up to go to Caribou for a change. We went in warmer times and sat outside which was lovely.
  20. Drakecula

    Housewatch: Drake Edition

    The fence has come down, which I thought was odd, and there's still bricks and all sorts of stuff everywhere, so I'm not sure if they've done the site clean even though they say they have... We peered through windows and there's still a fine layer of dust on kitchen benches, so we are a bit...
Back
Top