- Joined
- Nov 12, 2012
- Posts
- 27,969
- Qantas
- Platinum
- Virgin
- Platinum
- Star Alliance
- Silver
Well, to be fair, it's 4 years since the last announcement. but in hardcopy of the Hobart Mercury (AKA The Mockery) today finds a front page splash that Hobart Airport's 'redevelopment' will begin later this year ... with the car parks. and finished by late 2026. Strangely, the story is not on-line at the Mercury app, so you'll have to put up with some re-typing from me
* Travellers at the airport to go from 2.8mill in 2020 (middle of Covid!!) to 5.5 mill in 2042
* $60mill Fed money secured for runway strengthening project, allowing larger/heavier aircraft
* Terminal footprint doubled from 12,000 sq m to 23,000 sq m
... and that's about the sum total of what's in the article . So basically a waste of newsprint.
The current Master Plan is here : https://hobartairport.com.au/wp-con...irport-Master-Plan-2022_For-Print_reduced.pdf
There's the terminal expansion, and addition of 6 power-in, tug push out apron parking bays. Still no airbridges (as the CEO has repeatedly re-affirmed). No runway-length taxi-way. The only mention of 'lounge' in the document is the 'departure lounge' and its 2018 refurbishment, which involved putting wooden benches in to replace upholstered seating.
This is a "preliminary draft" (so basically meaningless).
So, nothing to see here ... move along ...
* Travellers at the airport to go from 2.8mill in 2020 (middle of Covid!!) to 5.5 mill in 2042
* $60mill Fed money secured for runway strengthening project, allowing larger/heavier aircraft
* Terminal footprint doubled from 12,000 sq m to 23,000 sq m
... and that's about the sum total of what's in the article . So basically a waste of newsprint.
The current Master Plan is here : https://hobartairport.com.au/wp-con...irport-Master-Plan-2022_For-Print_reduced.pdf
There's the terminal expansion, and addition of 6 power-in, tug push out apron parking bays. Still no airbridges (as the CEO has repeatedly re-affirmed). No runway-length taxi-way. The only mention of 'lounge' in the document is the 'departure lounge' and its 2018 refurbishment, which involved putting wooden benches in to replace upholstered seating.
This is a "preliminary draft" (so basically meaningless).
So, nothing to see here ... move along ...