- Joined
- Nov 16, 2004
- Posts
- 47,900
- Qantas
- Platinum
- Virgin
- Platinum
- Oneworld
- Emerald
- SkyTeam
- Elite Plus
AFF Supporters can remove this and all advertisements
Apparently, there was more done than just swapping furniture ...So EK spent 2 months to swap the furniture out … the fixed fittings look untouched
Brief of works -: Key tasks involve the replacement of broken tiles in various areas, including the reception desk, the entrance to the main lounge, the main lounge floor, and the walkways leading to the seating areas. Each tile replacement task will involve thorough removal, preparation, and installation to ensure seamless integration with existing finishes. Works also include the replacement of lighting fixtures and general FF&E and a commercial clean of the space upon completion.
That brief of works is clearly trying to make a simple task sound like heaps of work.Apparently, there was more done than just swapping furniture ...
Im sure lots will visit soon. Iirc QF pax will move over as soon as QF lounge refurbishment starts.That brief of works is clearly trying to make a simple task sound like heaps of work.
Let me de-code …
“Key tasks involve the replacement of broken tiles in various areas, including the reception desk, the entrance to the main lounge, the main lounge floor, and the walkways leading to the seating areas. Each tile replacement task will involve thorough removal, preparation, and installation to ensure seamless integration with existing finishes.”
=
“Replace 4 broken tiles”
Anyway, I’m sure someone will visit soon and report back.![]()