Hubby was there this week at the WSI Experience Centre. Was told construction will be completed at the end of 2025 but not operational until end of 2026 due to all the technology testing they have to do. (hands up AFF members to test the lounges)
Initially will take 10M passengers compared to SYD that does 45M passengers, but will eventually handle 82m pax.
Will start off with 6 airbridges and 13 gates.
Will not have a control tower, everything done remotely and with cameras.
Final picture is expected to look like with 2 run ways in 2062 - note control tower is a mistake.