Western Sydney Airport (WSI) Discussion

We are just hoping Day 1 comes a little earlier. Can’t wait
TBH, I don’t understand the “delay” (as mentioned a while ago). The physical works are basically complete. Yes, certification takes time but still saying opening in ~2yrs. What the actual…is going on?

The contract for the “Digital” tower was only signed a few months ago. First of its type in Oz. What could possibly go wrong? Sadly, a lot…
 
TBH, I don’t understand the “delay” (as mentioned a while ago). The physical works are basically complete. Yes, certification takes time but still saying opening in ~2yrs. What the actual…is going on?

The contract for the “Digital” tower was only signed a few months ago. First of its type in Oz. What could possibly go wrong? Sadly, a lot…
Airport commissioning is very very complex, and budle that with all the regulatory requirements. Honestly ine year from end of physical works seems quick if anything.

What may happen is thay they do a "soft opening" of sorts where some aspects of the airport begin operating before others, for example they may start freight operations first, before then allowing passenger flights.
 
physical works are basically complete
External works (IE. Waterproof or lockup stage in a house build are complete). Still a lot of internal work to go.

And then you've got to test systems - baggage, security, fire suppression (where Berlin had 10yr issues), tower integration etc.

Plus you kind of need the access roads and railway complete as well
 
External works (IE. Waterproof or lockup stage in a house build are complete). Still a lot of internal work to go.
Most of that is done. Many of news reports of updates on progress say things like “it looks like passengers could arrive tomorrow”.
And then you've got to test systems - baggage, security, fire suppression (where Berlin had 10yr issues), tower integration etc.
Yes, discussed previously. 2 yrs is still a long time. Unless the freight ops start sooner?

BER was literally an unmitigated disaster riddled with corruption, kickbacks etc. They pondered knocking it down and rebuilding…

Plus you kind of need the access roads and railway complete as well
Access roads are built (needed for construction). They’ll tart them up and other roads to improve access in due course.

The metro isn’t needed for freight but yes, I nice to have when passenger ops commence.
 
Offer expires: 18 Mar 2025

- Earn up to 100,000 bonus Qantas Points*
- Enjoy an annual $450 Qantas travel credit
- Don't forget the two complimentary Qantas Club lounge invitations and two visits to the Amex Centurion Lounges in Melbourne and Sydney.

*Terms And Conditions Apply

AFF Supporters can remove this and all advertisements

That was/is still the plan
In terms of taking off and landing any aircraft, I doubt there's much difference in the commissioning of freight vs passenger flights. I assume the passenger terminal and associated systems must be a little more complicated than freight operations.
 
But even that has been quoted as ~2yrs post those first test flights back in October.
There's probably testing for just about everything and there's only so many tests you can do a day- evacuation drills, fire drills, incident response drills with various outside services, IT testing, baggage system testing etc.

And not to mention if any of them goes wrong or a failure point is identified, they time need to implement a fix and retest.

This is also a political centre piece, so all the politicians would want the optics of launch day to look good.
In terms of taking off and landing any aircraft, I doubt there's much difference in the commissioning of freight vs passenger flights. I assume the passenger terminal and associated systems must be a little more complicated than freight operations.
Depends on how state of the art freight system they want to build. If they want a highly automated freight system that is probably more complex than PAX systems as ultimately we as humans are a lot more adaptable than machines.
 
Will be absolute state of the art.
2 minutes from aircraft to terminal via fully automated loading platforms with direct docking
Yeh in which case i would imagine all of those systems would need some serious testing too and it'd be just as convoluted as the incoming passengers stuff.
 
Will be absolute state of the art.
2 minutes from aircraft to terminal via fully automated loading platforms with direct docking

Yeh in which case i would imagine all of those systems would need some serious testing too and it'd be just as convoluted as the incoming passengers stuff.

Then yes, commissioning will take potentially longer than they expect ;)
 

Become an AFF member!

Join Australian Frequent Flyer (AFF) for free and unlock insider tips, exclusive deals, and global meetups with 65,000+ frequent flyers.

AFF members can also access our Frequent Flyer Training courses, and upgrade to Fast-track your way to expert traveller status and unlock even more exclusive discounts!

AFF forum abbreviations

Wondering about Y, J or any of the other abbreviations used on our forum?

Check out our guide to common AFF acronyms & abbreviations.
Back
Top