Am commencing renovations next month (05 March*) and am having the relevant items delivered now so that they are all ready for the big day.
The 26 boxes of tiles, plus grout etc were to be delivered today, probably this morning. Just got a call that the truck is too hot and can they deliver them tomorrow? No, it's my day off today and I'm working tomorrow.
Oh we'll try and get another truck. So maybe or maybe not.
I've spent the whole day at home unable to go anywhere, even close in case they came.
And then when they're delivered the pallet will be dropped off at the front door and I have to carry then inside.
I'm having the complete bathroom/toilet (2 rooms) stripped out and replaced. My 47 year old residence needs a refresh and this is the beginning. The walls and ceilings will be removed and replaced as will any floorboards as required. Am putting in a large shower with a fixed head and a flexible arm.
New toilet etc.
Tiled floor and walls to the ceiling. And getting ready for old age, am having the noggins put in the wall in case I need hand rails in the future.
On the other side of the bathroom wall a new oven will be installed.
All of the work is being done by licensed tradespeople so it will be done right.
Then I can do the preparation and painting and get the remaining carpet ripped up and floorboards sanded.
NBN (HFC
) is due in the next few months so a few changes here.
* Those who've read the lounge meetings threads will realise I'm returning from BKK on 04 March.